Read this first: building size isn't space you can rent#
Every provider list for Dallas quotes building square footage. That's not the space you can buy, and in Dallas the gap is on the record.
The Infomart: one building, three providers, one exchange#
1950 North Stemmons Freeway is the address to know in Dallas. Three providers rent space inside it, and it hosts the city's internet exchange.
| Provider | Site codes | Published size | Worth knowing |
|---|---|---|---|
| Cologix | DAL1, DAL2, DAL3 | Not published | DAL1 hosts DE-CIX Dallas, the exchange where networks swap traffic. That's peering, not a private line into a cloud. |
| Flexential | DAL01 | 80,447 sq ft · 6.66 MW (downtown hall only, third-party figures) | One code covering five building and suite listings. |
| Equinix | DA1–DA4, DA6, DA7, DA9–DA12 | Not published | GROUPED ROW: ten codes, the Infomart plus Equinix buildings next door. No per-building detail published. |
You can put three competitors in the same building into one bid. The fiber stays the same, so you compare price, term and service head to head. That's rare, so use it.
Who else runs data centers in Dallas–Fort Worth#
Checked against the providers' own material on August 26, 2026. Dallas–Fort Worth is many cities, not one: Richardson, Plano, Carrollton, Lewisville, Allen and Fort Worth each count. Every row names its city.
Digital Realty: twelve published sites#
Digital Realty publishes twelve Dallas sites with street addresses. It doesn't publish power for any of them.
| Site | City | Address | Building sq ft | Sold as |
|---|---|---|---|---|
| DFW10 | Dallas | 2323 Bryan Street | 387,500 | Racks and cages. The old downtown carrier hotel, and Digital Realty's most connected Dallas building |
| DFW36 | Dallas | 8435 N Stemmons Freeway | 35,000 | Racks and cages. Not the Infomart, which is 1950 N Stemmons |
| DFW11 | Carrollton | 4025 Midway Rd | 99,500 | Large dedicated space |
| DFW12 | Carrollton | 2440 Marsh Lane | 139,000 | Large dedicated space |
| DFW16 | Richardson | 1232 Alma Road | 106,500 | Large dedicated space |
| DFW17 | Richardson | 900 Quality Way | 115,000 | Large dedicated space. DataBank DFW2 is next door |
| DFW18 | Richardson | 1210 Integrity Drive | 464,500 | Large dedicated space |
| DFW25 | Richardson | 1215 Integrity Drive | 118,000 | Large dedicated space |
| DFW28 | Richardson | 850 E Collins Boulevard | 121,500 | Large dedicated space |
| DFW29 | Richardson | 950 E Collins Boulevard | 121,500 | Large dedicated space |
| DFW35 | Richardson | 907 Security Row | 139,000 | Large dedicated space |
| DFW26 | Lewisville | 2501 State Highway 121 | 831,500 | Large dedicated space. The biggest DFW building on this page |
The mid-size bench: where most buyers under a megawatt should look#
This is the part of Dallas that searches and AI answers miss. Leave it out and your bid comes back thinner.
| Provider | Site | City | Published detail | Worth knowing |
|---|---|---|---|---|
| DataBank | DFW1 | Dallas | 400 S Akard St | DataBank's headquarters, in the old Federal Reserve Bank. Cloud access runs through a partner. |
| DataBank | DFW2 | Richardson | 904 Quality Way | Next door to Digital Realty DFW17. |
| DataBank | DFW3 | Plano | 8375 Dominion Parkway | Confirmed FedRAMP Moderate, the federal security approval government work needs. Rare. Check it's current and covers your work. |
| TierPoint | Dallas | Dallas | 3004 Irving Boulevard | TierPoint's published list matched our own check exactly. One of the most reliable in our directory. |
| TierPoint | Dallas - Allen | Allen | 820 Allen Commerce Parkway | One of three providers in Allen. |
| TierPoint | Dallas - Fort Worth | Fort Worth | 13701 Independence Parkway | Bought January 2024. Its 18 MW figure is future potential, not built. |
| Evocative | DAL1 | Plano | Address not published | Plano, whatever the URL says. Not Cologix's DAL1. |
| Evocative | DAL6 | Plano | Address not published | Compliance certifications confirmed on the building's own page, June 2026. |
| Flexential | Dallas–Plano campus | Plano | Address not published | Hosts a 13 MW GPU deployment (April 2025), so the campus handles high-density gear. |
| 365 Data Centers | Richardson, TX | Richardson | Address not published | Ex-Sungard, bought 2022. No direct cloud connection. Compliance reports date to 2015–16, so ask for current ones. |
Large-scale capacity#
| Site | City | Worth knowing |
|---|---|---|
| DFW1 | Carrollton | Built for large deployments. No rate card. Not DataBank's DFW1. |
| DFW2 | Lewisville | No building detail published. |
| DFW3–DFW5 (Allen campus) | Allen | GROUPED ROW: three codes, one entry. |
What isn't built yet#
A lot of the Dallas capacity you'll hear about is still under construction. It's left out of the tables above:
- DataBank Red Oak, South Dallas. A planned 480 MW, eight-building campus. The first 180 MW targets Q2 2026.
- CyrusOne DFW7, Fort Worth. A 200 MW build under construction. Its Bosque County site sits about a hundred miles out.
- Flexential Talty, Kaufman County. Announced July 2026, first customers late 2028.
Planned space isn't space you can buy today. If you're quoted on a future date, ask what happens to your price and your commitments if it slips.
Networks and cloud connections#
Dallas networks meet in one place: the Infomart. DE-CIX Dallas sits in Cologix DAL1. Digital Realty's DFW10 on Bryan Street is the other downtown hub.
Cloud on-ramps: what's actually confirmed#
A cloud on-ramp is a private line into AWS or Azure inside the building. Fewer are confirmed than the marketing suggests:
- Equinix: Dallas is an AWS Direct Connect city. We couldn't confirm which AWS region.
- Flexential: reaches AWS, Azure, Google and Oracle over its own network, not inside the building.
- Cologix: cloud access through its marketplace, citywide.
- DataBank, TierPoint, Evocative and 365: through partners like Megaport.
Partner connections work fine. But they add distance and another company to call. Ask every provider whether your cloud connection is in the building or over a network.
When Dallas is right for you, and when it isn't#
It fits when#
- You want real price competition. That's the best reason to buy here. Global, national and mid-size providers compete, often in the same buildings.
- You want the middle of the country. Dallas sits between both coasts, so it makes a natural second site.
- You need federal-grade security. DataBank's Plano building has FedRAMP Moderate.
- You need high-density or GPU space outside the coasts. Large GPU deployments already run here.
- Texas land and power costs suit your plan, and you're fine running on the Texas grid.
It doesn't fit when#
- You need the deepest peering market. Dallas is strong. Northern Virginia is deeper, so bid both.
- You need space now and you're offered Red Oak, Talty or DFW7. Those are 2026–2028 stories. Ask what's live today.
- Your board worries about the grid. Get that answered in the bid.
- You need one provider across several continents. Most of the good options here are US-only.
When a big name is the right call#
- Equinix for its network depth and a global contract, right at the Infomart.
- Digital Realty for scale in Richardson and Lewisville, and DFW10 downtown.
- Cologix when you need the DE-CIX exchange. It's in their building.
Dallas punishes a three-name bid. Six or eight providers would have competed. Put them all in.
What data center space costs in Dallas#
No provider here publishes a price list. Every price is a quote. Here's why we don't publish per-provider numbers.
For a rough sense, asking rates averaged around $196 per kW per month for 250–500 kW across North America in the second half of 2025. That's a continent-wide asking price, not a Dallas quote.
Dallas has the widest price spread of any market in this library. Providers of every size compete in the same buildings. If you run one proper bid anywhere, run it here.
Common questions#
Who are the data center providers in Dallas?#
What is the Dallas Infomart?#
Is Dallas a good place for data center space?#
Who has space? Here's how you find out#
This page can't tell you who has space or what it costs today. With this much construction, the gap between "a campus exists" and "you can have some" is wide.
The real answer comes from asking every provider that fits, at once, about your project. Clectiv AI does that for you, across the Infomart and the suburbs in one go.